API Administración Portuaria Integral, Obra nueva en Manzanillo, Col.

  1. Channeling and Structured Cabling Category 6 128 Nodes.
  2. 26 Kilometers Blown fiber optic SUMITOMO Singlemode 24 wires 26 links.
  3. 75 KVA Electrical Substation for MDF Site Telecommunications.
  4. Emergency Plant for MDF Site Telecomunicaciones.
  5. 124 regulated contacts for CCTV cameras.
  6. Fiber optic fusion connectorization in MDF and IDF's.
  7. 12 Rack's for active equipment.
  8. Precision air conditioning system.
  9. 94 CCTV IP cameras.

Project information

Customer Integral Port Administration API
Category: Channeling and Structured Cabling
Place: Manzanillo, Colima, Mex
Date:
Rating: